Renewable energies
Tenaris Photovoltaic Plant Executive Design, Arcore, Italy
Client
BM GROUP POLYTEC S.p.A.
Location
Arcore (MB) Italy
Job
Renawable Energies - executive design of the 4,922.90 kWp photovoltaic power plant
Subject
Detailed design of 4,922.9kWp PV system in Arcore (MB) steel mill.
Activities performed
Executive design.
Period of performance
2023
Project Description.
Executive design of the 4,922.90 kWp photovoltaic power plant, to be placed on the roof of five buildings of the steel mill owned by Dalmine S.p.A., a Tenaris Group company, located in the municipality of Arcore (MB). Executive design of the electrical connection of the plant to the NTG of AT 130kV in the on-site cabin.
Gallery