Relocations and area expansion in Allnex plant
Client
Location
Job
Chemical & Petrochemical
Object
Multidisciplinary design for tanks relocation (Phase 1) and resin manufacturing
area expansion with new cascade reactors installation (phase 2).
Activities performed
Detail MULTIDISCIPLINARY engineering, including Process, Piping, Civil,
Electrical and Instrumental disciplines.
Period of performance
2018 – 2019
Project description
Multidisciplinary engineering including the Process, Piping, Civil, Electrical
and Instrumental disciplines aimed at the creation of a new slab for the relocation
of existing equipment, lines and cableways (Phase 1) in order to make
the area accessible for the expansion of the existing building with a new multi-
storey structure intended for the installation of two new reactors and related
powder and liquid dosing systems (Phase 2). The engineering also involved
interconnecting with all existing services.