Power plants
New combined cycle power plant, Presenzano (CE)
Client
GEKO S.p.A.
Location
PRESENZANO, 81050 - Caserta
Job
Executive design for the combined cycle power plant (760 MW)
Seingim was in charge of the executive design for the new power plant in Presenzano, equipped with high-efficiency gas turbines (Class GT36 H).
Gallery
Related projects
[
Back to Portfolio
]