Job
Engineering services for the Porto De Sergipe CCPP power plant (1600 MW)
Object
1500 MW Combined Cycle Power Plant. 7HA.02.3 Multi Shaft Configuration.
Activities performed
Civil & structural design & project coordination services.
Period of performance
2018 – 2020
Work team
Plant Client – CELSE (Centrais Elétricas de Sergipe S.A.)
Project description
Acting as A/E Consultant, Seingim has provided wide engineering services covering several aspects such us:
- Provision of engineering for construction permits and design endorsement as per brazil law requirements.
- Structural and civil detail design for power island and rest of plant buildings.
- Turbines machine foundation dynamic design and detail design of gt/st anchoiring systems.
- Modularisation design for main and secondary pipe racks including land and sea transportation design (from china manufacturing field to brazil site).
- Underground & electrical network design.
- Project coordination and field engineering support.