Client
SAIPEM S.p.A.
Location
DURUSU - Turkey
Job

Pipeline feasibility study

Feasibility study regarding retrofitting the existing terminal in Durusu (Turkey) where the two Blue Stream pipelines converge. The retrofit requires the installation of two new valves to regulate/interrupt the flow of gas from the Beregovaya station (Russia) to the Durusu Terminal and the replacement of the two existing insulation joints and corresponding facilities.

Gallery

Related projects

[
Back to Portfolio
]