Large photovoltaic plant – Porto Marghera, VE
Client
Location
Job
Designing the 3,139.56 kWp photovoltaic system in the Ex Ausidet area (Lot 12) in Porto Marghera, VE
Object
Design of the 3.139,56 kWp photovoltaic system in the Ex Ausidet area (Lot 12) in Porto Marghera, VE.
Activities performed
Feasibility study, detailed design.
Period of performance
2018 – 2019
Project description
Seingim was in charge of the design of the photovoltaic plant within the
boundaries of Lot 12 Ex Ausidet falling within the Site of National Interest
(S.I.N.) of Venice Porto Marghera, at the Industrial Port, which had a total
area of about 5.9 ha. The whole area was classified as an ‘Environmental
Restoration Area’.
The plant settled on a newly built delivery cabin inside Lot 12 Ex Ausidet
where the delivery point (so-called ‘POD’) was installed. The photovoltaic
field operated under the total transfer regime (full disposal scheme?). The
connection path of the plant was realized using a new delivery cabin connected
in-take-out on an existing MV line.