Oil & Gas
Piping mechanical engineering work (Furnaces B – 8791 – 8794)
Client
KIRCHNER ITALIA S.p.A.
Location
Iran
Job
Designing new gas lines, Iran
Seingim took care of designing the positioning of a series of gas lines (main gas, low flow gas, waste gas, natural gas) to power a series of burners (82) located on 2 heaters (Charge Heater – No.1-Intermediate Heater) + (No.2 Intermediate Heater – No.3 Intermediate Heater).
Related projects
[
Back to Portfolio
]