Decal S.p.A. facility, Porto Marghera (VE)
Client
Location
Job
Designing new tank connection lines (28 and 29) to renovate the water treatment plant at the DECAL facility in Porto Marghera, VE
As part of the “Water treatment plant” project, which plans to connect the dispatch pump for the rainwater collected in tank S-16 to the line dispatching to the SIFA consortium system, DECAL S.p.A. requested that the two warehouse lines supplying rainwater, coming from the collection tanks and directed to tank S-27 also be connected to the two adjacent S-28 and S-29 tanks, via two new 6” lines. Furthermore, the same S-28 and S-29 tanks will be connected via a specific new 4” line to the existing physical chemical plant, using an existing flanged connection, currently blind. In addition to using an existing foot nozzle (on the S-28 tank) and installing a new 4” one on the S-29 tank to connect the new 4” line, two new 6” nozzles will have to be made on each of the two tanks S-28 and S-29 to connect the new lines meant to transfer the water into tanks S-28 and S-29. Finally, in order to allow the new lines to pass to tank S-29, the 8” connection line between tanks S-27 and S-28 will be modified by putting in a vertical omega machine. The new lines will rest of newly constructed supports on the ground.