Chemical & Petrochemical
DECAL facility water treatment plant – Porto Marghera, VE
Client
DECAL-DEPOSITI COSTIERI CALLIOPE S.p.A.
Location
VENICE - Via Della Geologia, 30175 - Porto Marghera (VE)
Job
Multidisciplinary design of the water treatment plant for the DECAL facility in Porto Marghera, VE
The project involved the multidisciplinary design of the first flush and rainwater treatment system from the DECAL pump to the Area 23 ha pump collection tank or directly in the existing PEAD DN 355 piping.
Gallery
Related projects
[
Back to Portfolio
]